leafy | architectural | modern

Heidelberg Renovation: A First-Floor Addition Around a River Red Gum 

Heidelberg Renewal

Destination Living designed and built this Heidelberg renovation and first-floor addition for a family of four who had outgrown their 1970s rendered brick home. With an established pool to keep and a significant River Red Gum on the neighbouring block limiting how far the house could spread, the new rooms were added above and the ground floor was replanned around a relocated kitchen that opens to a deck overlooking the pool. Completed in 2022, the home now has four bedrooms and three bathrooms.

Project Overview

Location: Heidelberg, in Melbourne’s north-east

Project type: Home renovation with a first-floor addition

Existing home: 1970s rendered brick house built on a slope, with a lower-ground garage and cellar

Key constraints: An established pool, and a River Red Gum on the neighbouring block listed on the Banyule Significant Trees Register

What was kept: The lower-ground garage and cellar, the stair, the ground-floor bathroom, WC and laundry, and the pool, with its fencing unaltered

Ground floor: Relocated kitchen with a large pantry and glazed sliders to a deck overlooking the pool; living and dining opened into one space; façade windows lowered

First floor: Master suite with en-suite and walk-through robe, two children’s bedrooms with an adjacent rumpus, study desk and seat nook, linen cupboard and shower bathroom

The tree: A window placed so the clients’ son has a view of the River Red Gum

Completed: 2022, with four bedrooms and three bathrooms

Services: Architecture, interior design and construction by Destination Living, with interiors led by Grace, interior design director

 

Photo at dusk of a renovated two storey home with a white upper level and lit windows on a corner block

More About This Project

The Family and The Site

The family of four had outgrown their 1970s rendered brick home. They wanted a modern house that sat comfortably within the leafy character of this part of Heidelberg and embraced the established pool area, with skylights, a fireplace and an exterior in dark tones with timber.

Two conditions set the limits of the site. A River Red Gum on the neighbouring block is listed on the Banyule Significant Trees Register, and protecting it meant the house could not spread any further. The pool on the west side would stay where it was, its fencing unaltered. A Tree Protection Report set the extent of demolition and the protections during the works, and the existing structure was underpinned to the structural drawings.

The Design Response
With the footprint fixed, the existing house became the base for the new work. The lower-ground garage and cellar, the stair, and the ground-floor bathroom, WC and laundry were kept, and the construction was concentrated in two places: a replanned ground floor and a new level above it.

The ground floor
The kitchen was moved to make better use of the floor area and to connect it with the pool, and the new position made room for a large pantry. Large glazed sliders open from the kitchen to a deck overlooking the pool, which sits lower. With the old kitchen gone and some internal walls opened up, the living and dining areas became one connected space. The house is built on a slope. The façade windows were lowered to take advantage of the elevated views.

The first floor
Keeping the stair in its original position on the west side allowed it to continue up to the new level, finished with a handrail and balustrade. The master suite, with its en-suite and walk-through robe, takes the street end. The two children’s bedrooms are at the rear, with the rumpus adjacent to them. On the west side, above a pergola, a study desk and seat nook are set into the plan. The level also has a linen cupboard and a shower bathroom.

The River Red Gum
The neighbouring tree influenced the footprint of the home, but also became part of its experience. A carefully placed window frames a view of the tree from the clients’ son’s room.

The Outcome

The house sits on much the same footprint as before and now has four bedrooms and three bathrooms. The master suite and the children’s rooms occupy the new level, the ground floor is given to shared living around the kitchen, deck and pool, and the retained stair joins the two. The skylights and fireplace the family wanted are part of the house, and dark cladding on the upper floor gives it a modern face to the street within the surrounding greenery. The family of four now has the room it needed, without leaving the house.

Interiors and materials

The exterior combines light render with darker contrasting elements, creating a contemporary layer to the retained 1970s home. Internally, the palette follows the same approach, balancing light walls and dark joinery with the warmth and richness of timber.

The Team

Destination Living designed and built the renovation as one team, from concept to completion, with Grace, interior design director, leading the interiors.

Frequently Asked Questions

Why did this Heidelberg family build up instead of extending out?

A River Red Gum on the neighbouring block, listed on the Banyule Significant Trees Register, meant the house could not spread further across the site, and the established pool was staying. The extra space was added as a first floor over the existing footprint, with a Tree Protection Report setting the extent of demolition. A window was also placed so the clients’ son has a view of the tree.

Why renovate the 1970s Heidelberg home rather than knock it down?

With the footprint fixed by the tree, the existing house became the base for the work. The lower-ground garage and cellar, the stair, and the ground-floor bathroom, WC and laundry were kept, and the construction went into a new first floor and a replanned ground floor.

What did the first-floor addition add to the Heidelberg home?

A master suite with en-suite and walk-through robe at the street end, two children’s bedrooms at the rear with a rumpus adjacent to them, a study desk and seat nook, a linen cupboard and a shower bathroom. The home now has four bedrooms and three bathrooms.

How was the existing pool worked into the Heidelberg renovation?

The pool stayed where it was, with its fencing unaltered. The kitchen was relocated, and large glazed sliders now open from it to a deck overlooking the pool, which sits lower. The approach to the entrance leads around the pool.

Why was the kitchen moved in the Heidelberg renovation?

Moving the kitchen made better use of the ground floor, connected it to the pool through glazed sliders to the deck, and made room for a large pantry. Removing the old kitchen and opening up some internal walls joined the living and dining areas into one space.

Outgrowing a home you love? 

Before deciding to move or start again, it’s worth knowing what your existing house can become. We can look at your site and your structure together, and show you what’s achievable with one team from concept to completion.

Weatherboard facade and front verandah of the Mitcham heritage house
 
 
Related Projects and Readings

Renovations and extensions with Destination Living

Architectural renovations in Melbourne by Destination Living. Large-scale, design-led renovations where architecture, interiors, landscape and construction are considered together from the beginning.

Timber staircase and batten screen leading into the living and dining area with garden views

We renovate, we rebuild: how we help people decide

Deciding whether to renovate or rebuild is often the most important decision in a home project. Discover how we asses the home, site, budget, planning constraints and lifestyle goals to help Melbourne homeowners choose the right path with confidence.

Renovated cottage beside a new two storey home with white picket fences

Mitcham heritage renovation

How a Victorian weatherboard in Mitcham, in Melbourne’s east, kept its façade and roof under a Heritage Overlay and was re-planned largely within its footprint.

Weatherboard facade and front verandah of the Mitcham heritage house